Broadstone Oak Hills Apartments
San Antonio, Texas

Constructed in 2017-2018, Riner Engineering (RINER ) performed the geotechnical engineering and construction materials testing for the two to three story wood-framed apartment buildings, town-homes, two-swimming pools and parking/drive areas. Engineering recommendations were provided for the construction of post-tensioned reinforced concrete slabs and subgrade treatment options for both select fill and moisture conditioned on-site soils.

Pavement design recommendations were also provided for concrete pavements associated with this project.