Flashback Friday – Lockton Place, Houston, Texas – RINER provided construction materials testing services for Lockton Place, a Class AA midrise office development in Houston’s Westchase District. The development, finished in mid-2017, included an 8‐story 186,000 SF office building, and a 6‐story 220,000 SF parking garage.

The building and garage foundations consisted of shallow spread and strip footings. The office building was constructed using a concrete pan deck design with steel columns. The parking garage was precast design with cast in place topping slabs at the elevated decks. The project also included 26,000 SF of paving and ground parking areas.