Flashback Friday: RINER was contracted to provide geotechnical engineering and construction materials testing services for this 10-story, 342 room Springwoods Marriott hotel in Spring, Texas. The building was a post tension reinforced, cast-in-place concrete design over a spread footing foundation. Construction was briefly interrupted by flooding relating to Hurricane Harvey but was back up and running quickly to get the project completed. RINER’s testing and inspection work was ultimately completed in the summer of 2018. The Springwoods Marriott debuted in October 2018.