May 14, 2021 – Flashback Friday: Gables West Ave, Phase I & II, Houston, TX-2007.  Gables West Ave project consisted of four, eight-story mixed use residential/retail buildings and parking garages exceeding 1.5 million square feet.

RINER was selected as the Construction Materials Testing firm for the Phase I construction work with an inspection scope that included monitoring of building pad, garage foundation and utility earthwork, auger cast piles, conventional and post-tension reinforcing steel, concrete, structural steel inspections, fireproofing, and masonry.

As a result of our performance on Phase I, RINER was awarded both the Geotechnical Engineering and Construction Materials Testing on the Phase II expansion project.

Read more…