RINER Provides Geotechnical Services for the I-35 Capital Express TxDOT North-South Tunnel
Riner Engineering is immensely proud to have contributed to the Austin/Central Texas prestigious North-South Tunnel of the Capital Express project on IH 35!
Spanning from Holly Street to US 290 / SH 71, we performed a multitude of geotechnical engineering tasks which included approximately 1300-feet of drilling and rock coring, packer tests, as well as comprehensive field and laboratory testing.
This project is forecasted to span an 8 year duration. Kudos to our dedicated team for their unwavering commitment and professionalism.