RINER was selected to provide the geotechnical engineering and construction materials testing (CMT) for the seven three-story wood-framed apartment buildings, swimming pool and parking/drive areas.
Engineering recommendations were provided for the construction of post-tensioned reinforced concrete slabs and subgrade treatment options for both select fill and moisture conditioned on-site soils. Pavement design recommendations were also provided for concrete pavements associated with this project. Recommendations for water pressure injection to moisture condition the onsite clay soils were also provided.
This multifamily complex, The Grand at Stonecreek, located at San Marcos’ StoneCreek Crossing shopping center, will consist of 267 units spanning over 215,000 square feet.